This question was asked by
How long does the concrete need to have been laid before the Endura Faux Fusion stain is applied?
Concrete needs to have been down a minimum of 30 days before applying a coating to the surface, it is also recommended to acid wash the surface to remove any weak or loose material from the surface to ensure a good bond.
Drew Palin